Casella CEL Software for the Rainfall gauge system User Manual
Page 14

5.2
Permanent Connection Between a Rain
Gauge and PC
For permanaent connection, the user can extend the communication cable up
to a maximum length of 25 m. Use a suitable screened cable such as
-W4/0724 and a junction box configuration.
1.
Use an extended version of the communications cable, long enough
to connect between the output socket on the logging module and
the 9-lead communication port on your PC.
2.
Release the two catches securing the outer cover to the base of the
rain gauge.
3.
Carefully lift off the cover and stand it in a safe place.
4.
Remove and split the rubber gromet shown in Figure 3.
5.
Pass the smaller connector of the extended communications cable
through the grommet hole in the base plate to reach the output
connector on the logging unit.
6.
Fit the the split grommet around the cable.
7.
Refit the grommet in its hole in the base plate, and seal it with
silicone rubber compound.
8.
Unscrew the captive cover plug from the output socket on the
logging module (Figure 3).
9.
Connect the cable to the output socket on the logging module.
The output socket has a pip to ensure correct alignment.
10.
Seal all weather connections using a silicone rubber compound.
11.
Replace and re-secure the rain gauge outer cover.
12.
Connect the other end of the extended cable to the 9-lead com-
munication port on the PC.
13.
Download data from the rain gauge, display the current status and
initialise the rain gauge as described in Chapter 6.
Connection
Page 14 of 24
Rainfall Logging System -
User Manual