Check network wiring – Crestron electronic DIN Rail Control Processor DIN-AP2 User Manual
Page 33
Crestron DIN-AP2
DIN Rail Control Processor
12. Find and select the correct firmware file (.CUZ or .zip) and click
Open.
13. In the “Firmware” window, click Send. You will see a
“Confirmation” window asking if you’ve selected the right file.
Click OK and you will see the “File Transfer” window.
14. When file transfer is completed, you will see a window asking you
to re-connect. Click OK, then close the “Firmware” window and
re-connect using the normal Address Book entry.
Network Analysis
If Cresnet analysis is required, contact Crestron’s True Blue Support.
Battery Replacement
A Lithium battery is used to power the system clock within the
DIN-AP2. Under normal conditions, it will last for approximately 10
years. In the event that the clock fails, only an authorized technician
should replace it. Refer to caution statement below.
CAUTION: Danger of explosion if battery is incorrectly replaced.
Replace only with the same or equivalent type recommended by the
manufacturer. Dispose of used batteries according to the manufacturer's
instructions.
Check Network Wiring
Use the Right
Wire
In order to ensure optimum performance over the full range of your
installation topology, Crestron Certified Wire and only Crestron Certified
Wire may be used. Failure to do so may incur additional charges if
support is required to identify performance deficiencies because of using
improper wire.
Calculate
Power
CAUTION: Use only Crestron power supplies for Crestron equipment.
Failure to do so could cause equipment damage or void the Crestron
warranty.
CAUTION: Provide sufficient power to the system. Insufficient power
can lead to unpredictable results or damage to the equipment. Please use
the Crestron Power Calculator to help calculate how much power is
).
Operations & Installation Guide – DOC. 6662A
DIN Rail Control Processor: DIN-AP2
• 29