beautypg.com

Jaypro Sports FNSB-65 User Manual

Page 7

background image

Rev: -

Page 7 of 8

Install Net:
Lay the net sections out lengthwise along the base of the poles. Attach D-Rings to the net
at each intermediate pole location. Attach the hoisting ropes to each cable end and D-
Ring. Slowly raise the net up, attaching the sliding cable loops to the net approximately
every 5 ft. While raising the net, attach any net sections together using cable ties located
about 12” o.c.
Once the net is fully raised, secure the bottom edge of net to each pole as shown in below.

5/16” x 3 1/8”
SNAP HOOK

(ATTACH EVERY 5 FT)

5/16” x 3 1/8” SNAP HOOK

ATTACH TO CABLE LOOPS

END OF JOISTING ROPE

TIE KNOT TO 5/16” x 3 1/8”

SNAP HOOK

ATTACH 5/16” x 3 1/8” SNAP
HOOK TO D-RING & CABLE

CLAMPS TO AIRCRAFT CABLE

END POLES

INTERMEDIATE POLES

END POLES

5/16” x 3 1/8” SNAP HOOK

(ATTACH TO CABLE LOOPS)

INTERMEDIATE POLES

5/16” x 3 1/8” SNAP HOOK

(ATTACH TO AIRCRAFT CABLE)

Figure 7