beautypg.com

Jaypro sports – Jaypro Sports PB-5PI User Manual

Page 2

background image

REV-A

JAYPRO SPORTS

21’ PERMANENT PLAYER’S BENCH, PB-5PI

LIST OF MATERIALS

PIECE NO.

PART NO.

DESCRIPTION

QTY.

1

AR5052

SEAT PLANK 21’

1

2

PB-L

BENCH LEG PERMANENT

4

3

HN5046

5/16” FLANGE NUT

12

4

HS5035

#8 PAN HEAD SCREW x ½”

4

5

HB5030

5/16”-18 x 3” CARRIAGE BOLT

12

6

AR5044

HOLD DOWN CLIP

8

7

EP0018

2” x 2” END PLUG

8

8

AR5045A

END CAP

2

ASSEMBLY INSTRUCTIONS

TOOLS REQUIRED: PHILLIPS SCREWDRIVER BIT WITH ELECTRIC DRILL (1),

½” SOCKET WRENCH OR ADJUSTABLE WRENCH

1) Slip the end caps (8) snugly onto each end of the plank (1). Using the electric

drill, assemble a self-drilling screw (4) through the cap and into the flange of the
plank. Two screws are required per end cap.


2) For easiest assembly, position seat plank (1) on a level raised surface such as a

desk top, bleacher seat or work bench. Place the carriage bolt (5) and bolt clips
(6) approximately into place within the slots of the plank. Note that the legs
should be no more than 8” from the plank edge or 9” from edge to center leg.
Also assemble a bolt (5) and nut (3) through the lowest hole of the leg extension
to help lock the leg in the footing.

3) Position the legs as shown and loosely assemble the hardware illustrated in ‘detail

a-a’. Do not fully tighten the hardware at this time.

4) Stand the unit upright level the bench and make sure the legs are adequately

spaced apart. Tighten all fasteners fully.

5) Locate your bench and dig footings to the dimensions shown on the illustration.

Mark each leg at 18” from bottom of leg.

6) Fill in footings with concrete, then, lower assembled bench into the footings.

Block up under bench to support the bench at the mark on each leg. Level seat
plank and adjust bench as necessary.

7) Allow footings to cure at least 72 hours before removing the supports or using the

bench.