7] gas supply requirements, Provide adequate gas supply, Installation instructions – GE C2S985SETSS User Manual
Page 43
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Installation Instructions
Read these instructions completely and carefully.
[
7
]
Gas Supply Requirements
Recommended Gas Pipe Outlet Locations
Provide Adequate Gas Supply
Your range is designed to operate at a pressure of 5" of water column on natural gas or,
if designed for LPgas (propane or butane), 10" of water column.
Make sure you ore supplying your range with the
type of gas for which it is designed.
This range is convertible for use on natural or
propane gas. If you decide to use this range on LP
gas, conversion must be made by a qualified LP
installer before attempting to operate the range on
that gas.
For proper operation, the pressure of natural gas
supplied to the regulator must be between 5" and
13" of water column.
For LP gas, the pressure supplied must be between
10" and 13" of water column.
When checking for proper operation of the regulator,
the inlet pressure must be at least 1" greater than
the operating (manifold) pressure as given above.
The pressure regulator located at the inlet of the
range manifold must remain in the supply line
regardless of whether natural or LP gas is being
used.
A flexible metal appliance connector used to connect
the range to the gas supply line should hove on I.D.
of 1/2" and be 5 feet in length for ease of installation.
In Canada, flexible connectors must be single wall
metal connectors no longer than 6 feet in length.
43