Introduction, Before you begin, What you need – Rockwell Automation Migrating PanelView Enhanced Terminal Applications User Manual
Page 121: Chapter 9, Introduction before you begin what you need, Chapter
121
Publication 2711P-QS001A-EN-P - October 2007
121
Chapter
9
Measure and Improve Runtime Application
Performance
Introduction
In this chapter, you will learn how to benchmark performance of your
runtime application so that you can make improvements as needed.
Before You Begin
•
Review migration considerations (Chapter 1).
•
Select a PanelView Plus terminal replacement and adapter plate,
if required (Chapter 2).
•
Optionally install the PanelView Plus terminal in the existing
PanelView 1000e or 1400e panel cutout (Chapter 2).
•
Import your PanelBuilder 1400e .pvc application into
FactoryTalk View ME software (Chapter 3).
•
Review the conversion log for your migrated application
(Chapter 4).
•
Review object and expression mapping (Chapter 5).
•
Review unsupported features and common migration issues
(Chapter 6).
•
Correct, validate, and test the application (Chapter 7).
•
Create, download, and run the application on a PanelView Plus
terminal (Chapter 8).
What You Need
•
A runtime application file downloaded and loaded in your
PanelView Plus terminal.
•
Your migrated application in FactoryTalk ME software with
modifications based on unsupported features and workarounds
for migration issues.