Marshalltown DL11 Drywall Lift User Manual
Page 9
8
Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www
.MARSHALLTOWN.com
8
Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www
.MARSHALLTOWN.com
9
EXTENDING LOAD RAILS
The load rails can be extended to help support
wide loads.
TO EXTEND ThE rAILS:
1. Pull the ring on the spring loaded plunger and
slide the rail out. The spring loaded plunger will
engage in the next available position.
WARNING
!
The spring loaded plunger must be fully engaged prior to lifting a load.
WARNING
!
Never lift a load without ensuring it is properly balanced and
supported on the cradle.
LOAD SUPPORT HOOKS
TO POSITION ThE LOAD SuPPOrT hOOkS IN OPErATING POSITION:
1. Pull the ring on the spring loaded
plunger and rotate the hook from the
stowed position. Ensure that the spring
loaded plunger is fully engaged prior to
loading drywall onto the lift. NEVER
ATTEMPT TO LIFT A SHEET OF
DRYWALL WITHOUT POSITIONING
THE LOAD SUPPORT HOOKS IN THE
OPERATING POSITION.
LOAD SuPPOrT hOOk
WARNING
!
Attempting to lift a sheet of
drywall without using the
load support hooks can
result in injury.
WARNING
!
Atempting to lift more than
one sheet of drywall can
result in injury