5
BASE
ASSEMBLY
LOCATING
POST
OPERATING PROCEDURE
ASSEMBLING DRYWALL LIFT
TO ASSEMBLE YOur LIfT:
1. Open the legs on the base assembly to their operating postion. Make sure the spring
loaded plungers are fully engaged and are locked securely in position.
2. Place the mast assembly firmly into the base. Make sure the mast locating ring is firmly
seated onto the base locating post.
Your MARSHALLTOWN Drywall Lift will arrive in three section, the Base, the Mast and
the Cradle. Complete assembly will take less than five minutes.
BASE
MAST
CrADLE
MAST
LOCATING rING
2
1