beautypg.com

Assembly, Drive shaft/power head, Throttle linkage and ignition leads – Echo PE-266 User Manual

Page 13: Pe-266/s assembly

background image

PE-266/S

ASSEMBLY

X7502026303

13

© 6/2014 ECHO Inc.

ASSEMBLY

Drive Shaft/Power Head

1. Stand power head upright on a level surface.

2. Loosen the drive shaft clamp bolt (A) at engine drive shaft

clamp.

3. Remove dust cap if necessary, and carefully fit drive shaft

assembly to engine making sure that inner drive shaft
engages into clutch mount.

Note: Gear Housing must be aligned properly with engine.

4. Tighten drive shaft clamp bolt (A) securely.

5. Route throttle linkage and ignition lead assembly below fan

housing.

Throttle Linkage and Ignition Leads

1. Close choke and remove air filter cover.

2. Place throttle linkage (C) through adjustment fixture (D) and

install wire end into large carburetor throttle swivel hole (E).
Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. The
throttle linkage must be adjusted by moving the adjustment
fixture (D). Consult with your Echo Dealer for correct
adjustment procedure.

3. Connect 2 ignition stop leads (F, G) from throttle cable

tubing to 2 ignition leads (F, G) on engine.

Parts Required:

Power Head, Drive Shaft Assembly

I

A

C

D

E

F

G

This manual is related to the following products: