Personnel Work Platform (619A & 723A)
Description
P/N
Personnel Work Platform, ANSI ............................... 1001103637
Personnel Work Platform, ANSI (French) ................. 1001103736
Personnel Work Platform, ISO.................................. 1001103730
Use Personnel Work Platform Capacity Chart
To determine maximum capacity, refer to “Telehandler/Attachment/Fork Capacity” on
page 5-2.
The operator and personnel in platform must read and understand the
separate personnel work platform manual prior to installing and using a
platform.
The joystick (1) controls lift/lower and extend/retract movement of the boom.
The attachment tilt roller switch (2) controls platform tilt.
• Push roller switch down to tilt up.
• Push roller switch up to tilt down.
Installation Procedure:
• Ensure carriage is properly installed. Refer to “Attachment Installation” on
• Secure the personnel work platform to the forks by sliding the personnel work
platform onto the parent forks and install the retaining pin behind the vertical
shank of the fork.