beautypg.com

Troubleshooting, Visual check, Voltage supply check – Class1 ESM3 User Manual

Page 13: Master switch check, Load manage enable check, Output test

background image

13

TROUBLESHOOTING

GMC / AMS

04-27-2000

REV B

P.N. 104702

TP1

TP2

TP3

TP4

R21

U24

U23

R20

R19

R18

R17

R16

R15

R14

C18

C17

http://www.class1.com

FAX 352-629-2902

PHONE 352-629-5020

OCALA ,FL

Z1

XT1

U22

U21

U20

U18

U16

U15

U14

U13

U12

U11

U10

U9

U8

U7

U5

U4

U3

U2

U1

RSP2

RSP1

R11

R10

R9

R8

R7

R6

R5

R4

R3 R2

L2

L1

J1

FT14

FT12

FT11

FT10

FT8

FT7

FT6

FT5

FT4

FT3

FT2

FT1

FT15

FB2

FB1

F1

D7 D6

D5 D4

D3

D2

D1

C16

C15

+

C14

C13

C12

C11

C10

C9

C8

C7

C5

C4

C3

C2

C1

T15

T14

T13

T12

T11

T10

T9

T8

T7

T6

T5

T4

T3

T2

T1

SW1

FT13

R12

R13

U19

U17

J2

J3

J4

J5

J6

J7

J8

J9

SW2

BATTERY

SWITCH

Switch

Master

GROUND

POSITIVE

3
4

1

2

1

2

3

4

BATTS

SHED

T15

SHED O/I

MAIN/ISO

7 1

OVER VOLTS

NO

MAIN

1 7

FAST IDLE

YES

ON

OFF

ON

OFF

GND

POS

Out-1

Out-2

Out-3

Out-4

Out-5

Out-6

Out-7

ISO

MASTER

TB 12
INPUT

GND

POS

GND

POS

GND

POS

GND

POS

GND

POS

GND

POS

Master Switch

Polarity Jumper

Output Polarity

Jumpers

FT8

FT9

Voltage Test Points:
TP1

System Voltage

TP2

Filtered Voltage

TP3

+5 VDC

TP4

Ground

SW1

configuration switch

Terminal 12

Control Jumper

Caution: If this jumper is in
the Master Switch position,
it is tied directly to Terminal 10

Visual check

Check jumpers J1-J9 and ensure that they are in the correct position for the application.
Check switch SW1 that 1-4 are in the correct postion for the operation desired.

Voltage Supply check

Check for system voltage between terminals T14 (ground) and T13 (12VDC). Check for sys-
tem voltage betweenTP4 (ground) and TP2 (12 VDC). These should be within 0.5 VDC.
Check for 5 VDC between TP4 and TP3 (+5 VDC).

These voltages must be present for the system to operate.

Master Switch check

Verify that J1 is in the proper position for the Master Switch you are using. Check for the input
at T10.

This controls load sequencing on and off.

Load Manage Enable check

Check for a ground at T11.

This inputs allows loads to shed and the Fast Idle output.

Output Test

Verify that jumpers J2 through J8 are in the correct position. With power on and a Master
switch input there should be either 12 VDC or Ground on T1 through T7 dependent on the the
position of J2-J8.