LBL Lighting 2-Circuit MO Element Adapter User Manual
Two-circuit monorail fusion jack adapter, Installation instructions for, Circuit monorail 1a 1b

Installation Instructions for
Two-Circuit Monorail Fusion Jack Adapter
1.0
PENDADAPMONOFJ2_
980MR2FIXC
G
P
I
:
ENERAL
RODUCT NFORMATION
This product is ETL listed and suitable only for indoor dry locations
and approved for use at any height above the finished floor.
This product is intended to be used with LBL 2-Circuit Monorail
system.
1
Install the Adapter onto the 2-Circuit
Monorail for Down Light Fixtures
Push and screw the fixture Fusion Jack completely into the
Fusion Jack adapter.
FIXTURE
FUSION JACK
FUSION JACK
ADAPTER
To power up the fixture from circuit #1, tighten the M3 set
screw on top of the cap with the 1.5MM Allen wrench. Make
sure that the set screw is tight for proper power
connection.
M3 SET SCREW
1.5 MM ALLEN
WRENCH
CIRCUIT #1:
COMBINATION
OF THESE RAILS
M3 SET SCREW
CIRCUIT #2:
COMBINATION
OF THESE RAILS
To power up the fixture from circuit #2, remove the M3 set
screw from top of the cap and screw it into the side of the
Fusion Jack adapter hole with the 1.5MM Allen wrench. Make
sure that the set screw is tight for proper power
connection.
NOTE:
Never use more than one set screw to select
a circuit on the Fusion Jack adapter.
NOTE:
Do not load either circuit over the maximum
system rating.
1.5 MM ALLEN
WRENCH
Unscrew the cap from the Fusion Jack adapter.
Select a place on the 2-Circuit Monorail where the fixture is
going to be mounted.
From the bottom, place the Fusion Jack adapter onto the
2-Circuit Monorail.
Replace and tighten the cap to the Fusion Jack adapter.
Make sure that the cap is not cross threaded.
CAP
FUSION JACK
ADAPTER
2-CIRCUIT MONORAIL
1A
1
1A
2
2
3
4
3
2-Circuit Monorail
1A
1B
5
5
1A
6a
1C
6a
1D
6b
6b