beautypg.com

Ab a – American Water Heater HCG3 130T 300 User Manual

Page 30

background image

30

four concentric terminations
1. When installing four concentric terminations through a roof or

through a sidewall in close proximity they may be arranged

into stacked rows of two as shown in Figure 34 or lateral rows

of two as shown in Figure 35.

2. Four is the maximum number of concentric terminations that

may be installed in a group where all terminations are in

close proximity as shown in Figure 34.

A

A

A = 0 - 2 INCHES (0 - 5 cm)

CLOSE PROXIMITY

CONCENTRIC

TERMINATION

CAPS END VIEW

FOUR CONCENTRIC TERMINATIONS

(THROUGH A ROOF OR SIDEWALL

)

Figure 34

A

B

A

FOUR CONCENTRIC TERMINATIONS

(THROUGH A ROOF OR SIDEWALL

)

A = 0 - 2 INCHES (0 - 5 cm)

CLOSE PROXIMITY

B = 24 INCHES (61 cm)

OR GREATER

CONCENTRIC

TERMINATION

CAPS END VIEW

Figure 35

groups of terminations
1. When installing multiple groups of concentric terminations

through a roof or through a sidewall in close proximity they

can be installed into stacked groups of four as shown in

Figure 36. Lateral groups of four as shown in Figure 35 may

be a more convenient installation arrangement for multiple

groups depending on available space.

A

A

B

A = 0 - 2 INCHES (0 - 5 cm)

CLOSE PROXIMITY

CONCENTRIC

TERMINATION

CAPS END VIEW

EIGHT CONCENTRIC TERMINATIONS

(THROUGH A ROOF OR SIDEWALL

)

B = 24 INCHES (61 cm)

OR GREATER BETWEEN

GROUPS OF FOUR

Figure 36

multiple concentric termination clearances
When installing multiple concentric terminations vertically through

a roof or horizontally through a sidewall ensure the required

clearances (separation) between terminations are maintained.

Ensure multiple terminations are arranged or grouped as

required.
note: These clearances must be maintained to prevent the

recirculation of vent (exhaust) gases to the intake air. Clearances

are measured between the edges of the concentric termination

caps.
When installing multiple concentric terminations through a roof

or through a sidewall the clearances shown in Figure 32 must

be maintained.
See Multiple Concentric Termination Arrangements on page 31.
close proximity & standard clearance
1. The clearance between multiple termination caps must be 0

inches (touching) to a maximum of 2 inches (5 cm), dimension

A - Figure 32, when installing concentric terminations in close

proximity. See Figure 37 on page 31.

2. The clearance between multiple termination caps must be

increased to a minimum of 24 inches (61 cm), dimension B -

Figure 32, when installation in close proximity (above) is not

possible. This is the standard clearance.

A

OR

B

A = 0 - 2 INCHES (0 - 5 cm)

CONCENTRIC

TERMINATION CAPS

END VIEW

TWO CONCENTRIC TERMINATIONS

(THROUGH A ROOF OR SIDEWALL

)

B = 24 INCHES (61 cm)

OR GREATER

CLOSE PROXIMITY

STANDARD CLEARANCE

figure 32

three concentric terminations
1. When installing three concentric terminations through a roof

or through a sidewall the third termination may be installed

in close proximity as indicated by dimension A in Figure 33.

2. If close proximity installation of the third termination is not

possible the third termination may be installed as indicated

by dimension B in Figure 33.

A = 0 - 2 INCHES (0 - 5 cm)

CLOSE PROXIMITY

CONCENTRIC

TERMINATION

CAPS END VIEW

THIRD

TERMINATION

THREE CONCENTRIC TERMINATIONS

(THROUGH A ROOF OR SIDEWALL

)

A

A

B

B = 24 INCHES (61 cm)

OR GREATER

Figure 33