Brocade FCoE Switch Module for IBM BladeCenter Installation and User’s Guide User Manual
Installation and user’s guide
Table of contents
Document Outline
- Safety
- Chapter 1. Introducing the Brocade FCoE Switch Module
- Chapter 2. Installing and replacing a high speed switch module
- Chapter 3. Installing and removing an SFP+ module
- Chapter 4. Cabling the switch module and the SFP+ module
- Chapter 5. Information panels, LEDs, and external ports
- Chapter 6. Configuring the switch module
- Establishing a TCP/IP session through the management module
- Enabling management through external ports
- Configuring the switch module through the Telnet interface
- Configuring the switch module through the mini-USB interface
- Connecting to the switch module using Web Tools
- Initial configuration
- Logging in to the switch module
- Configuring for FCoE
- Backing up the configuration
- Resetting the Brocade FCoE Switch Module to factory defaults
- Chapter 7. Understanding Access Gateway
- Chapter 8. Updating the firmware
- Chapter 9. Parts
- Chapter 10. Solving problems
- Appendix A. Getting help and technical assistance
- Appendix B. Notices
- Trademarks
- Important notes
- Electronic emission notices
- Federal Communications Commission (FCC) statement
- Industry Canada Class A emission compliance statement
- Avis de conformité à la réglementation d’Industrie Canada
- Australia and New Zealand Class A statement
- CE statement
- United Kingdom telecommunications safety requirement
- European Union EMC Directive conformance statement
- Germany Electromagnetic Compatibility Directive
- Japanese VCCI Class A statement
- Korean Class A warning statement
- Russia Electromagnetic Interference (EMI) Class A statement
- People's Republic of China Class A warning statement
- Taiwanese Class A warning statement
- Appendix C. Product Specifications
- Index