Maintenance and repair – Vestil S-xxx-FF User Manual
Page 49
49
Model: S-62-AA/FF/FA
Gently push the tiller throttle assembly in place. Again, it’s just reversing steps 5 through 9 to
get the tiller throttle assembly back on the handle. Re-install the 3 allen screws, verify no
switches are sticking, and that the thumb wheel moves freely. Turn the unit on and verify
operation. This completes the assembly.
Maintenance and repair
(A) BEFORE EACH USE INSPECT FOR THE FOLLOWING:
5mm
allen
screws;
3
places
See also other documents in the category Vestil Equipment:
- ABLT-H (7 pages)
- ABLT-H-LP (5 pages)
- ACH-60 (20 pages)
- ALL-T-2-GPT (10 pages)
- ALL-T-2 (9 pages)
- A-LIFT (12 pages)
- AIR-2000 (12 pages)
- AHLT (12 pages)
- AHA-KIT Come-Along kit (5 pages)
- AHA (25 pages)
- AF-xxxx (4 pages)
- APPL-1200-xx (1 page)
- ASP Series (5 pages)
- ATD (6 pages)
- ATP (9 pages)
- ATS (9 pages)
- BC series (12 pages)
- BOL-OR-40-BK (3 pages)
- BOL-SS-42-5.5 (5 pages)
- BOL-SSTOR-42-4.5 (5 pages)
- BT (20, 40, & 60) (12 pages)
- SELF SUPPORTING BRIDGE CRANE (9 pages)
- CART-DS-1000 (15 pages)
- CAN-A (1 page)
- CART-23 & -24, ALL MODELS (12 pages)
- CART-500-SCL (1 page)
- CART-550-SS (15 pages)
- CART-D-FR (18 pages)
- CART-S-FR (18 pages)
- CB-PMPS (13 pages)
- CBS Series (13 pages)
- CB-W-P (1 page)
- CB-W-S (1 page)
- CC-30-MC (59 pages)
- CH series (12 pages)
- COL-3-26-14 (5 pages)
- CYL-CK (1 page)
- CUP-3131 (4 pages)
- CPC (10 pages)
- CP Series (8 pages)
- COL-4-36-23 (5 pages)
- COL-3-26-44 (5 pages)
- COL-3-26-23 (5 pages)
- H series hoppers (13 pages)
- D-150 Dock Seals & Shelter Survey Sheet (1 page)