beautypg.com

Service journal – Poulan Pro Pro 900 ZX 968999302 User Manual

Page 73

background image

English-

71

SERVICE JOURNAL

Action

Date, mtr reading, stamp, sign

300-Hour Service

1. Inspect the machine. Come to agreement with the customer

as to which additional work is to be carried out.

2. Perform the 25-hour service.

3. Perform the 50-hour service.

4. Perform the 100-hour service.

5. Check/adjust the mower deck.

6. Clean the combustion chamber and grind the valve seats.

7. Check the engine valve clearance.

8. Replace the air cleaner’s pre-filter (foam).