beautypg.com

Frame installation – Alamo Axtreme 02984405 User Manual

Page 40

background image

© 2006

Alamo Group Inc.

Section 4 - 12

Axtreme Boom (Asy. Man) 07/06

Figure 34

Figure 33

Frame Installation

Turret Assembly Installation

:

1.

Turret Assembly. Theturret assembly is

shipped assembled with the hydraulic swing cyl-
inders, hoses, pivot bearing assembly, boom
mount weldment and mounting pins installed
(See Figure 35 & 36).

2.

Under Frame Weldment. The Under frame

weldment center section is designed for the turret
assembly to mount on the RH side. Remove the
one long mounting pin and the front and back
short mounting pins (See Figure 36 & 37). Check
to make certain the mounting bolts mounting the
center ubder frame weldment are installed with
the bolt heads unter frame weldment and nuts are
on top visible looking down, if they are in wrong the
swing cylinders will hit the bolts causing damge to
cylinders and bolts. (See Figure 37)

Figure 35

Figure 36

Turret Attaching
Pin, Short Pin,
one Front side
and one rear
side.

Center Section
Under Frame
Weldment

Turret Mount
Attaching Pin,
Long Pin

Turret Mount
Attaching Pin,
Long Pin

NOTE: Turret Assembly shown as diassembled for
illustration only, Turret will be shipped as an assembly
when shipped with mount kit.

Rev 02-20-07