Rough Country 1131 User Manual
Page 2

FRONT INSTALLATION INSTRUCTIONS
1. Remove the lower sway bar link from the axle and the sway bar using a 15mm & 18mm wrench. See Photo 1.
2. Install supplied pin on the axle with supplied crush sleeve. See Photo 2. Hold using a screwdriver & tighten 1/2” lock
nut using a 3/4” wrench.
3. Assemble the sway bar link with the link body, the jam nut and rod end Adjust the sway bar to a length of 11 1/4”
from top to bottom. Tighten the jam nut against the rod end using a 19mm & 5/8” wrench.
4. Install the sway bar link on the upper sway bar mount with the supplied 12mm flange lock nut. See Photo 3. Tighten
using a 18mm & 5/8” wrench.
5. Remove the stock bolt from the vehicle on both driver and passengers side and install the sway bar bracket with
stock hardware. Tighten bolt using a 15mm wrench. See Photo 4.
6. With the sway bar link installed on the supplied frame bracket, swing the bracket and sway bar link up and position
the bracket on the frame as shown in Photo 5.
7. Install on the lower axle mounting pin. Install the disconnect hitch pin. See Photo 6. Note: When disconnected the
hitch pin will be used on the upper mount to secure the sway bar link to the mount.
Thank you for purchasing a Rough Country lift for your Jeep.
Photo 1
Remove Lower Sway Bar Link from Axle Mount
Photo 6
Install the sway bar link on the axle with hitch pin
Photo 2
Photo 3
Install the link on the mount
Photo 4
Place the mount on the uni-body
Photo 5
Install the pin on the axle
POST INSTALLATION
• Check all fasteners for proper torque. Check to ensure there is adequate clearance between all rotating, mobile,
fixed and heated members. Check steering for interference and proper working order. Install warning sticker.