Important, Keep feet clear of foot and probe – Veris Technologies EC Force Probe - Operating Instructions User Manual
Page 16
OM17-P4000 Force/EC
5-3
Field Operation
Probe Platform
- Start engine and allow to warm a minute or two before cycling
– a few minutes if
during cold weather.
- Extend to full rear position
- Fold into upright position (figure 5)
- Lower foot to soil
- Raise probe (figure 6)
- Install Probe or core sampling
components
Important! --
When folding and retracting the platform make sure that
probe mast clears engine muffler. This can be achieved by shifting left to right as
you fold the unit.
Figure 5
Figure 6
KEEP FEET CLEAR OF
FOOT AND PROBE