beautypg.com

Dealer service 21, Dealer service, Important – Woods Equipment 7000 User Manual

Page 23

background image

Dealer Service 21

MAN0137 (9/14/01)

DEALER SERVICE

Cont’d

Install Blade Spindle

IMPORTANT

Pulley installation sequence is very important

for bearing life. Follow the sequence exactly.

1. Insert spindle through bottom of mower deck and
install three mounting bolts. Be sure to position
grease fittings toward lubrication access areas.

2. Install pulley (16) and split taper bushing (17) with
integral key on spindle shaft.

3. Install bolt (44) and flat washer (45) in top of spin-
dle shaft. Torque this bolt to 12 lbs.-ft.

4. Install split taper bushing bolts (47) and lock
washers (42).

5. Alternately tighten and torque to 12 lbs.-ft.

Figure 11 Spindle Installation

Replace Oilite Bushings

1. Six pre-oiled bronze Oilite bushings are used in
the lift mechanism, two in front and four in rear (see
Figure 12). Oil these bushings once a year to extend
their life cycle.

2. When replacement is required, use a new bush-
ing to press the old bushing out. Make sure the new
bushings are pressed in flush.

Figure 12 Oilite Bushing Location

44

45

16

47

42

DD3413A-1

17

Oilite Bushing

Oilite Bushing

Left Rear Rockshaft Mount

Left Front Lift Stop

LA2

This manual is related to the following products: