Schedules, Figure 4.5 schedules configuration menu – Falcon F3400 User Manual
Page 41

www.rletech.com
41
970.484.6510
4
Configuration Menu
4.3. Schedules
Figure 4.5 Schedules Configuration Menu
The Schedules page allows users to schedule the activation and deactivation of relay outputs.
This is useful for cycling redundant equipment such as chillers, generators, etc. Relays are
assigned these schedules through the Relay Configuration menus. Begin DOW is the day of the
week the schedule will begin, and End DOW is the day of the week the schedule will end.
Note
Press the Submit Changes button when done to save all schedule changes.
This manual is related to the following products: